Close Menu
    • Automotive
    • Business
    • Editorial
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    New Delhi DiaryNew Delhi Diary
    • Home
    • Contact Us
    New Delhi DiaryNew Delhi Diary
    Home » In a second attempt, NASA wants to launch a new moon rocket
    Technology

    In a second attempt, NASA wants to launch a new moon rocket

    August 31, 2022
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    As a result of engine trouble, NASA will try again to launch its redesigned moon rocket on a test flight this week on Saturday. Fueling procedures are being changed to address the issue, managers said. It is also possible that a malfunctioning sensor caused Monday’s launch to be scrapped.

    In a second attempt, NASA wants to launch a new moon rocketNASA’s 322-foot (98-meter) rocket, the most powerful ever built by the agency, remains on its pad at Kennedy Space Center. An attempt will be made to send the capsule around the moon and back using the Space Launch System rocket. It will be a test flight without people, just three test dummies, the Associated Press (AP) reported.

    Upon successful launch, it will be the first lunar capsule since NASA’s Apollo program 50 years ago. If the problem reappears and the countdown is halted again, NASA’s rocket program manager, John Honeycutt, said the Saturday launch would provide additional insight. Rather than sitting around scratching our heads about whether it was good enough, that’s a better option.

    Based on what I’ve heard from the technical team today, what we need to do is pore over the data and refine our plans for developing the flight rationale. One of the four main engines in the rocket’s core stage could not be chilled sufficiently prior to liftoff during Monday’s launch attempt. According to Honeycutt, the hydrogen fuel temperature appeared to be as much as 40 degrees Fahrenheit (5 degrees Celsius) warmer than the desired minus-420 degrees Fahrenheit (minus-250 degrees Celsius).

    Chilling will begin a half-hour earlier for Saturday afternoon’s launch attempt once fueling begins. This engine chill down was conducted earlier during successful testing last year, so executing it earlier may prove beneficial. In addition, Honeycutt questioned the integrity of one engine sensor, saying it might have provided inaccurate information on Monday. It would take weeks to change that sensor, he said, since the rocket would have to be hauled back into the hangar.

    This $4.1 billion test launch marks the beginning of NASA’s Artemis moon-exploration program, named after the twin sister to Apollo in Greek mythology. As early as 2024, astronauts could strap in for a lap around the moon, and in the year 2025, they might even attempt a landing on the moon.

    Related Posts

    MEAPMP Launches: Revamped Independent Ad-Tech & Premium Media Buying Across MEA

    November 3, 2026

    Sam Altman calls UAE most forward-looking country on AI

    November 3, 2026

    Apple iPhone Duo sets a new benchmark for foldable design

    November 2, 2026

    Apple’s iPhone Duo pairs passport design with key compromises

    November 2, 2026

    Apple brings Touch and PROLED XDR display to MacBook Pro

    October 29, 2026

    Integrated Identity Enters Global Top 0.1% with Rare 100/100 Google PageSpeed

    October 29, 2026
    Latest News

    Egypt reserves climb $151.6 million to record $57.5 billion

    November 6, 2026

    – Egypt’s foreign reserves climbed by $151.6 million in October to a new record of $57.5 billion, the Central Bank of Egypt (CBE) said. Net international reserves reached $57.4998 billion at the end of the month, up from $57.3482 billion

    Botswana diamond output rises 14% as economy shows recovery

    November 5, 2026

    – Botswana’s diamond production has risen 14% this year, helping the economy recover from a two-year slump, as the government raised its 2026 growth forecast to 3.8%. The Ministry of Finance had initially forecast growth of 3.1%. Output reached 15.1

    Pune Metro Line 3 opens as Modi lays Phase 2 foundation

    November 4, 2026

    – Pune’s Hinjawadi to Shivajinagar metro corridor opened on Tuesday as Prime Minister Narendra Modi inaugurated and laid the foundation stone for metro projects worth around ₹21,800 crore. Modi took part through video conferencing. The new Line 3 gives a

    MEAPMP Launches: Revamped Independent Ad-Tech & Premium Media Buying Across MEA

    November 3, 2026

    Middle East and Africa Private Market Place (MEAPMP) today announced the commercial launch of its revamped independent supply-side platform (SSP) and curated media marketplace, connecting enterprise media buyers and agencies directly with premium regional inventory across 73 countries. Operating from

    © 2026 New Delhi Diary | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.